1. Skip to site navigation
  2. Skip to main navigation
  3. Skip to content

TSA Management


Sidebar navigation

Bulk Liquids Berth 2, Port Botany

  • Client: Sydney Ports Corporation 
  • Role:   Project Management & Advisory Services 
  • Cost:   $80 million 
  • Date:   2010 / 2011

The BLB2 project comprises construction of a steel piled pier berth adjacent to the existing BLB1, associated infrastructure such as marine loading arms, fire fighting equipment, onshore support facilities and pipelines from existing user sites to the new berth. The open access, multi user berth will operate on a 24 hour/ 7 day per week basis.

BLB2 has been designed to accommodate 120,000 dead weight tonne vessels to a maximum of 270m length overall.

TSA Management is providing project management services to Sydney Ports during the contractor procurement phase of the project. The role involves the engagement of technical consultants, design management and managing the geotechnical investigations. TSA staff also assisted with the development of tender / contract documents.

 

smart people
smarter solutions